QUALITY

Our mission is to supply RELIABLE quality Sleeves and clamps at affordable cost to cater the needs of nation.

Our Goal is to emerge as market leader by preserving the confidence of our valued customers.

We shall endeavor to continually improve through group efforts.

We are committed to develop, implement and maintain an effictive Quality Management System in compliance with ISO 9001:2008 Standard.

 
  Quality Assurance Plan
 
Sr.No.Process OperationQuality CharacteristicsReliable Pipes and Tubes Ltd.hod Of Control
1Raw Material (Strip)1> Dimensions
2> Chemical analysis
3> Control of Slit which within specified limits
4> Surface
Actual measurement as per Std.
Analysis of all elements as per Std
Testing as per various Std.
Measurement of width, thickness & recording visual inspection.
2Tube Mill (GTAW Type)1> Weld Test, Flare Flanges, Flattering Reverse bend & Reverse Flattening.
2> Inspection of weld, seam
3> Dimensions
4> Surface
Testing as per ASTM specification & recording the result. One test for every 30 to 35 Mtrs. Visual inspection weld zone. O.D. , Thickness & Length.
Check roller surface profile& finish.
3Solutions Annealing (At Min. 1040 C)
With continuous water quenching.
1> Temperature
2> Hardness
3> MicroReliable Pipes and Tubes Ltd.er
Automatic Relay Temp / Controller Adjusted to present level. Measurement of hardness as per Std. one Test / Lot / Heat
4StraighteningStraightness OD Surface FinishAdjust roller setting measure visual
5CuttingSquare cut LengthRight angle to length, visual
6DeburingBurs removel On OD and ID EdgesVisual
7Chemical Treatment
a) Pickling
b) Passivation
c) Bath
Concentration
Concentration
Temperature
One Test / Bath Day
One Test / Bath Day
Temperature
8Hydrostatic Pressure TestTest Pressure100 % Inspection at test pressure specified as per ASTM Std.
9Final InspectionIGC Test Dimensions Surface Physical Testing
Grade Check
Product Analysis
As per standard 100 % inspection of Dimensions as specified.
Visual Inspection for surface defects, Physical Testing and Chemical analysis as per ASTM standards.
10MarketingMarking as per Std.Check for proper marking
11PackingSeaworphy Packing / Wooden CartCheck for packing, Quantity, shipping mark,
error: Content is protected !!